Branding

Utility Container

Middle School Construction

Before Construction

PUMS before construction

Much of the renovation at the middle school involved a space to the right of the front door known as the "old" library.

PUMS before construction

Prior to the renovation, there was an unused basement level courtyard that has now been filled in. This is a "before" photo.

PUMS before construction

Before the renovation, the lower level of the "old" library was below ground level and there were two doors leading out to an unused courtyard.

PUMS before construction

Before the renovation, the lower level of the old library was used for meetings. It has been transformed into classroom and collaborative learning space areas for middle school classes. This is the "before" photo.

PUMS before construction

The "old" middle school library (upper level) before construction. This area is now a collaborative classroom with new furniture and glass walls.

PUMS before construction
PUMS before construction

In 2013, the middle school renovated and created a new library and learning commons. The former library area, or the "old" library was used for meetings and special events. 

PUMS before construction

At the middle school, the "old" library was on two levels. After the new construction, it all all one level and the new space includes three learning areas and collaborative spaces.

PUMS before construction
PUMS before construction
PUMS before construction

Before the renovation, there was a small security area near the front door of the middle school. This area, adjacent to the health office, was renovated as part of the referendum construction. The new room has enhanced security and a direct view of the middle school entrance.

PUMS before construction

Before the renovation, there was a photo copy station near the nurses' office.

PUMS before construction

After Construction

puts post construction

As part of the referendum improvements, new classroom space was created. This used to be part of the "old" library.

puts post construction

This area was part of the "old" middle school library. It is now part of three learning spaces which are all located on the same level and have new furniture designed for collaborative learning.

puts post construction

As part of the referendum renovation at the middle school, there are now improved private areas for students in the health office. In addition, the health office has been expanded, totally updated and renovated. 

puts post construction

What was once the "old" library has been transformed into three learning spaces. This is the main space when you enter from the hallway.

puts post construction

Clean, bright and flexible spaces are now located in what was the "old" library. All of the learning spaces are on the same level and there is nothing that is below ground level. New furniture was selected to be attractive and practical for student collaborations.

puts post construction

The health office in the middle school now includes updated facilities for students who need medical attention.

puts post construction

The new learning spaces have a variety of furniture and are designed to be versatile.

puts post construction
puts post construction
puts post construction

The referendum project at the middle school created new areas for student collaborations.

puts post construction

As part of the referendum renovation, the entrance to the middle school has been improved and includes enhanced security.

puts post construction

The new security area at the middle school has a window directly into the security vestibule.

puts post construction
puts post construction

The new Health Office at the middle school.

puts post construction
puts post construction

New furniture at the middle school encourages student collaboration.

puts post construction

The renovation project in the middle school included new tables for the cafeteria.

PUMS Post Construction
PUMS Post Construction